Engineering & Power Planning

Reliability is designed in.

Anyone can rent a generator. BTIG engineers the entire power system before it ships — so capacity, redundancy and distribution are proven on paper long before they're proven on site.

An engineer reviewing a single-line power distribution diagram on a laptop and printed schematic
The discipline

From load study to single-line, documented to standard.

Every BTIG deployment is backed by an engineering package: a measured load profile, generator sizing with redundancy, distribution topology, cable schedules and the compliance documentation your venue and stakeholders expect.

  • Load calculations & demand modelingEvery fixture, distro and motor accounted for — with realistic diversity and headroom.
  • Generator sizing & redundancyRight-sized plants with N+1/2N strategies — never over-spec, never exposed.
  • Single-line & distribution designClear diagrams and cable schedules that crews and inspectors can trust.
Engineering deliverables

What you get before a single cable is pulled.

Load & capacity study

A measured, itemized demand model with peak, diversity and growth headroom across the full footprint.

Single-line diagrams

Clear electrical schematics showing generation, distribution, protection and critical-load paths.

Distribution topology

Cabling layouts, cable schedules and labeling plans built for fast, error-free install and strike.

UPS & redundancy plan

Critical-load mapping, ride-through strategy and battery/UPS sizing for zero-blink operation.

Standards & compliance

Documentation aligned to recognized event, electrical and safety standards for sign-off and inspection.

Operational plan

Energization sequence, monitoring scheme, contingency procedures and crew assignments for show day.

Engineering workflow

A repeatable path to a bulletproof system.

PHASE 01

Discovery

We gather your production, schedule and load data and define reliability targets.

PHASE 02

Modeling

We build the load study, size generation and design the distribution and UPS topology.

PHASE 03

Documentation

Single-lines, cable schedules and compliance packages are issued for review and sign-off.

PHASE 04

Validation

We commission and test against the design, then hand over an as-built operational plan.

Bring us in early.

The best time to engineer power is before the budget is locked. Share your project and we'll scope the system right.