BTIGPOWER
A compound of industrial generators and power distribution units beside an illuminated stadium at dusk
Temporary Power Infrastructure

Power that never
misses a beat.

BTIG Power engineers, builds and operates turnkey temporary power for the world's most demanding events — from a single stage to an entire Games. Generation, distribution, event-grade UPS, and the engineering to make it all bulletproof.

24/7
On-site response
100+ MW
Deployable capacity
Global
International operations
Who we are

More than equipment. A power partner from concept to load-out.

BTIG Power is a full-service temporary power company. We don't just drop generators — we calculate the load, engineer the distribution, manage the project, and keep your show powered from first cable pull to final strike.

01

Engineered, not improvised

Every deployment starts with load calculations, generator sizing, single-line diagrams and redundancy planning — documented to industry standard.

02

Built for any application

Festivals, stadium sport, broadcast compounds, film, industrial and emergency response — one team, one accountable scope, any scale.

03

Uptime you can stake a show on

N+1 generation, event-grade UPS and 24/7 on-site technicians mean the lights, the broadcast and the experience never go dark.

Organized event power distribution racks, cable looms and battery UPS cabinets in a temporary technical enclosure
End-to-end scope

Generation. Distribution. UPS. All under one roof.

From prime and standby generation to the last cam-lock connector, BTIG owns the entire power chain — including event-sized UPS systems that protect broadcast, timing and life-safety loads from the smallest dip.

  • Prime & standby generationSynchronized generator plants with N+1 redundancy and remote monitoring.
  • Power distributionDistros, cable management, transformers and metering, designed and labeled to plan.
  • Event-grade UPS & batterySeamless ride-through and clean power for critical and broadcast loads.
22+
Years of field expertise
100%
Uptime on critical loads
N+1
Standard redundancy
24/7
On-site technicians
How we work

A disciplined path from brief to power-on.

STEP 01

Assess & calculate

We map every load, model peak demand and define redundancy targets before a single cable is specified.

STEP 02

Engineer & design

Single-line diagrams, generator sizing, distribution layouts and cable schedules — fully documented.

STEP 03

Deploy & energize

Our crews install, terminate, test and commission the system to plan, on schedule.

STEP 04

Operate & support

24/7 on-site monitoring and technicians through every show day until safe load-out.

Featured project

Powering a continent's biggest stage.

Multi-Sport Games Large-scale night event with stage lighting and a vast crowd
Multi-Sport Games

Venue-by-venue temporary power across an entire Games footprint.

As Lighting & Power lead, BTIG developed comprehensive venue power calculations, generator-plant sizing, distribution topology and UPS requirements across competition and broadcast clusters — building the technical standards and operational plans that keep a multi-venue, multi-week event reliably energized.

Multi-venue
Cluster infrastructure
Broadcast
Grade UPS & lighting
Turnkey
Engineering to ops
View all projects

Let's power your next event.

Tell us about your project and our engineers will scope the power infrastructure you need — anywhere in the world.